Project Name: Connection Project between Shuinan 40M-11 Road and Zhongke East Road in Taichung City, Taiwan Province
Project location: At the junction of Shuinan 40M-11 Road and Zhongke East Road in Taichung City, Taiwan Province
Project Overview: The road project at the junction of Zhongke Road in the Shuinan Economic and Trade Park will cross the 80 meter wide Huanzhong Road and Taichung 74 Zhongqing Underground from Zhongke Road to the east, and enter the planned road 40M-11 in the Shuinan Economic and Trade Park. The total length is 552 meters, and the project cost is about 93.62 million yuan. The project utilizes aerial ramp overpasses to divert vehicles and adopts a landscape cable-stayed bridge design, constructed like a harp.
Product information:
产品名称 | 设计阻尼力(kN) | 设计位移(mm) | 阻尼指数 | 阻尼系数 (kN·(s/m)α) | 数量(套) |
粘滞阻尼器 | 250 | ±30 | 0.35 | 500 | 20 |